Layout:
Home > A Major project is off and running.

A Major project is off and running.

January 11th, 2007 at 08:21 am

This morning I did my housework before my handyman friend arrived today.

We had lunch together another one of Mezze platters with crackers. I have fridge full of unusual and salad ingredients that can be used for mezze, as well olives, Hummus and feta cheese.

Together we put up the bird-net and pegged any openings that were left after it was tried up.

My dripping tap got fixed, it had worn felt and it was reset and new felt & washer replaced, this tap was done in October too!

After buy the trading post and looking at want was on offer for French doors 2nd-hand. Well! Not much and price was from $195 to $700 and none saying if it was for outside use. So we went off to check the prices for new doors and what was available. It was place that sold only doors and they were having a Sale as well. As it’s odd size door opening 1390mm wide so I can only have a normal door and half door panel that will fit. After looking at all the half doors side from $299 each then the buy a door on top it would cost around $700 for both plus fittings.

We looked around and found some doors on sale full solid wood door RRP $211 each. Looking at it, an idea came into my head why couldn’t we buy two doors and cut one to make a mock side panel that is a half opening door bolted to look like a half side panel that is in fact a door. I bought two full doors that I will need to varnish after one is cut to size. We bought also the doorknob and hinges for both doors only bolts will need to be bought for this part of this project. Costing $340 all up (RRP price $531) saving $191. My friend was a tradesman so was able get a better price than I would have had bought them on my own. Best price I would have got was $427 for the same things. I have budget around $1200 for this job, so I will be able now to put the rest towards the security door and bolts etc. I still got $860 earmark for this project but I don’t need to spend it all!

Today’s Full price Tally $ 531
Today’s Savings - $ 191
2007 Total $-t-r-e-t-c-h Savings Tally $9093.45

3 Responses to “A Major project is off and running.”

  1. LuckyRobin Says:
    1168508631

    Kitty, what is Mezze? Good job on a creative solution for those doors.

  2. Carolina Bound Says:
    1168516455

    Good work! Wish I could say I was under budget on my project!

  3. nance Says:
    1168539435

    Creativity can save a lot of money. Good job!

Leave a Reply

(Note: If you were logged in, we could automatically fill in these fields for you.)
*
Will not be published.
   

* Please spell out the number 4.  [ Why? ]

vB Code: You can use these tags: [b] [i] [u] [url] [email]